Thanks for visiting!

This blog documents the planning and construction of N scale modules based on CSX (ex-L&N) trackage in Pensacola, FL. focusing on the spur running down Tarragona St. to the Port of Pensacola and the small BN (ex-Frisco) interchange yard a few blocks to the west down Main St. Ultimately modules may be added representing spots along the rest of the PA Subdivision (selected for their operating potential) from Pensacola to River Junction, FL. and possibly a few locations along the PD Subdivision (Flomaton, AL to Pensacola, FL).


Tuesday, August 17, 2010

Pensacola Port Yard Track Plan

The track plan for the Pensacola Port yard has been added to the Track Plans page. This module will connect to the tracks that cross Main St. on the Tarragona to Port Entrance Module.

This small yard borders the north end of the port property south of Main St.  When being switched the track heading north up Tarragona St. was used as the switching lead.  This line branches off the main line about two miles to the north and only one train occupies this line during normal operation so the only worry is non-rail traffic on both Tarragona and Main St.  Fusees were used so I may look into simulating that for operating realism.

Although the number of tracks on the plan is greatly reduced from what was there during the era I'm modeling it's not far off in length ...and is pretty close to what remains there today in both number of tracks and arrangement.  The plan has the tracks named following the prototype.   The tracks exiting the module on the right side are tracks that enter the port property through gates in a chain link fence.  The arrangement of the turnouts is very close to the prototype and will allow future expansion should I decide to add another module.  It would include another warehouse on the port property and is served by tracks on either side that would connect to the tracks exiting the yard module.

As drawn the yard will easily hold a couple of dozen cars.  Since the interchange yard will hold about a dozen this should work well since the yard job (Y202) always brought a cut of cars down the hill from Goulding Yard to start the evening switching.  On the model a dozen or so cars can come from staging representing Goulding to the north.  Y202 was always a shove using one of the L&N's bay window cabs as a shoving platform.  Following prototype practice the crew will then pull the cars from the Frisco interchange ( a dozen or fewer on the model) back to the Port.  This could easily load the port yard with a couple of dozen cars to sort and make a shove back to the interchange.  Finally the crew will spot the port and Tarragona St. industries before heading back to staging

I am still researching what paperwork I want to drive the operation.  I am considering car cards and waybills although a switch list or work order as used by the prototype would be more realistic in terms of actual paperwork.  I will leave that to cover in a later post once decided.

No comments:

Post a Comment